Workers haul away side panels removed from the South Shelter.
Workers haul away side panels removed from the South Shelter.
Excavation team cleans the South excavation area for the new season.
Thaer and Jerrod remove mudbrick wall collapse in the South excavation area.
Excavation team cleans the South excavation area for the new season.
Ahmed installs wifi network in the South Area for connecting to excavation database on site.
Onur and Numan clean Building 160 to start the 2017 excavation season.
Onur and Numan clean Building 160 to start the 2017 excavation season.
Excavation team cleans the South excavation area for the new season while children visit the site.
Cristina and Nada clean the South excavation area at the beginning of the 2017 season.
Jerrod, Thaer, and Ahmed clean the South excavation area at the beginning of the 2017 season.
Marek, Arek, and Duygu clean at the bottom of the South excavation area at the beginning of the 2017 season.
Excavation team cleans the South excavation area for the new season.