On Site Today at Çatalhöyük

Chris helps Kasia with a skeleton removal in a Building 80 burial (South Area) as Justine logs details.

On going excavation in Trench 3 of the TP Connection area just East of the South Shelter.

Wide view of the North Area excavation underneath the shelter.